U.S. Steel Košice, s.r.o.

GO Oxygen Turbo Compressor TKO2

The project was performed in cooperation with the Energyco s.r.o company with in the following scope:

  • Repair of electric installations – vault, HV field, LV distributor and cable connections;
  • Repair of drive circuit in the form of a replacement of resistance cascade by thyristor rectifier;
  • Introduction of a new B&R 2005 control system;
  • Repair of regulation and measurement circuits;
  • Production and delivery of distribution technology